Fractional Commissioning Management CxM

Operationally Ready Buildings with up to 60% lower CxM costs

Fractional Commissioning Management Benefits

Low Cost

Digital First

Evidence Based

Every project is contractually required to deliver operationally ready building systems with verified performance

Systems Commissionability Design Reviews (QM)
Level 0 Cx
Specifications
Drawings Schematics
Controls Sequences of Operation
System Installation Reviews (QC)
Level 1 Cx
Factory Acceptance Testing (FAT) if specified
Level 2 Cx
Submittals
Site Acceptance Testing (SAT)
Commissioning Method Statements Commissioning Plan
Systems / Prime Equipment Start-Up (QC)
Level 3 Cx
Prime / Specialist Equipment Vendor Start-Up
Pre Functional Testing (PFT)
Prime / Specialist Equipment Commissioning
Systems Commissioning (QC)
Level 4 Cx
Functional Performance Testing (FPT)
Level 5 Cx
Integrated Systems Testing (IST)
Commissioning Report
Systems Post Occupancy Mandatory FLS Testing
FM H&S Compliance
Functional Performance Testing (FPT)
FPT Reports

Operationally Ready: “the readiness of Systems, Information & People for sustainable operation of the building”

The 3 Factors of Operationally Ready

  1. Building + all systems 100% operationally tested & ready
  2. As built/record documentation plus data validated & available
  3. People/operators trained & ready (Familiarized, Inducted and Trained)